Showing posts with label darjeeling tea plantations. Show all posts
Showing posts with label darjeeling tea plantations. Show all posts

After the hike in salary of the sub-staff of Darjeeling Tea plantations, the super-staff salary hike is also on the chart which will be applicable from April 2012.

After negotiations with the Darjeeling Terai Dooars Plantation Labor Union (DTDPLU) - affiliated to the Gorkha Janmukti Morcha (GJM) - the garden management has announced a 33% salary hike for super-staff including clerks, medical and technical workers.

After the increase in bonus and wages of the sub-staff earlier this year, the DTDPLU had been demanding an increase in salary of the super-staff. The union had even threatened to paralyze work in the garden last week after the management failed to do so.

Finally, the decision to increase the salary was taken at a meeting that was held till late in the night on Monday. There are more then 1,400 super-staff in the 87 tea gardens in the Hills of Darjeeling. "The 33% hike will be applicable for three years," said Sandeep Mukherjee, principal adviser to the Darjeeling Tea Association (DTA), an umbrella organization of the 87 Darjeeling Tea gardens.

Trade union leaders expressed satisfaction over the hike. "We are happy that our demand was met," said Suraj Subba, secretary of DTDPLU.

At present, the Darjeeling Tea plantation technical workers get something between Rs 3,000 and Rs 4,500 according to their seniority and grade. The salary of medical and clerical staff range between Rs 8,000 and Rs 9,000.

Source: Times of India

DARJEELING: The army stepped in on Tuesday to build a metal bridge at the landslide-hit area to help resume traffic movement. Sunday's landslide had devoured a 30-metre stretch of the Lebong Cart Road. Vehicular movement from the main town to the northern parts had to be diverted to the upper stretches where the road is narrow and small.

The 113 Engineer Regiment of the Indian army at Lebong surveyed the landslide site near Sharma Garage just above the Happy Valley tea estate. "Work to build the bridge would begin from Wednesday and we hope to resume vehicular movement within three days," said Brigadier R S Rawat, of the Dogra Regiment. The bridge on completion will be christened 'Mayaloo 113' after the regiment's number.

The PWD will continue with the repair of the road work. "We were already in the process of restoring the road that was damaged prior to the earthquake and the landslide. Now we will concentrate in strengthening the road from the bottom," said a senior PWD official.

The Dogra Regiment is located at Lebong about four kilometers from the landslide area.

The Lebong Cart Road connects the town with Singamari, where Gorkha Janmukti Morcha's (GJM) main office and reputed boarding schools and colleges are located. It also leads to Sikkim via Jorethang. Several Darjeeling Tea plantations are also located beyond the landslide site.

Trilok Dewan, the Darjeeling MLA visited the landslide site with the army and district administration officials. "It is encouraging to see the army at the fore. I request the district administration to ensure that the army is not impeded while they are at work to restore traffic movement," said Dewan.

Bengal Governor M.K.Narayanan arrived in Darjeeling on Tuesday and visited the landslide area in the afternoon. He will be meeting officials of the district administration later in the evening to take stock of the situation in the Hills post the earthquake and landslide.

Source: Times of India

Darjeeling: Just when the life of people in the Hills was are limping back to normalcy after the 6.8 magnitude earthquake shook the entire eastern India, a massive landslide devoured a 30-metre stretch of Lebong Cart Road late Sunday night, cutting off connectivity with the northern parts of Darjeeling. However, no casualties have been reported in the incident.

Lebong Cart Road connects the town with places like Singamari and some Darjeeling Tea gardens such as Phoobsering, Barnesbeck, Singla, Ging and also the army cantonment at Lebong. All vehicular movement has now been diverted from the Birch Hill Road.

"Incessant rain in the past 24 hours has damaged a vast stretch of Lebong Cart Road. We have diverted all traffic flow to the north side of the town from the upper stretches. It will take about a month to repair the road," said Darjeeling DM Soumitra Mohan.

No property has been damagedin the incident that occurred. However, according to civil defense officials, more rain could prove to be dangerous. "The September 18 earthquake in Sikkim has also affected the Hills. Cracks have appeared on several roads that need to be plastered to avoid water seepage," warned Gopal Rai, a senior government official. Incidentally, the road was already damaged and repair work had started prior to the earthquake and rainfall.

Several schools in the northern half of the town asked students to return home because of persistent rainfall. One school declared Puja holiday before schedule.

"We did not want to take any chance. So we declared the Puja holiday from today itself. The situation is quite precarious in the Hills with the recent earthquake and now this incessant rainfall," said Father Kinley, rector of St Joseph's School at Singamari.

Vacation at the school was supposed to start from Friday.

With the road cut off, the residents of Singamari may face difficulties in getting their drinking water, which is supplied by tankers.

"The Birch Hill Road is too narrow and a one-way lane. Traffic system will be in disarray from now with heavy vehicles, including that of the army and water supply,

plying on this road. Besides, it will be difficult to travel more than 2 km on foot everyday to reach town for work," said Mohan Tamang, a resident of Singamari.

Source: Times of India

KOLKATA: In its bid to make the Darjeeling cuppa less expensive, the government, along with the Tea Board of India, is trying to make use of renewable energy in the gardens of Darjeeling. Almost 20 gardens have showed interest and submitted their respective detailed project reports to the ministry of renewable energy (MNRE).

"We have received detailed project reports from gardens interested in having captive micro hydel generating units, which we forwarded to the MNRE. The latter has sought some changes in these DPRs and has asked the gardens to get a no-objection certificate (NOC) from the state government regarding use of those waterfalls within its gardens for hydel power generation," a Tea Board official said.

According to the official, Tea Board has asked Darjeeling Tea Association (DTA) to inform the tea garden owners about the changes sought by MNRE. DTA informed that there are around 60 water heads in the Darjeeling gardens. There are around 87 tea gardens in Darjeeling now.

By using this renewable energy, the tea gardens can surely curtail their cost of production. Uninterrupted power supply is a genuine problem in that zone and the gardens entail huge expenses when they run operations on diesel. All these costs add to the tea prices.

"Already the Makaibari Tea Estate has prepared a project report and given it to the MNRE. Two others - Dooteriah and Kalej Valley Tea Estate and Rongmook Ceders - have started working on this project," said Bengal power and renewable energy department's chief adviser S P Gon Chaudhuri.

One of the niche Darjeeling Tea garden, Makaibari Tea Estate, has submitted its DPR to the MNRE and the department has asked it to seek NOC from Darjeeling Gorkha Hills Council (DGHC). "We plan to generate hydel power from river Rakti, which is running through our estate. We plan to generate 4 MW from it, which we will be able to use for our gardens and the surplus we can supply to the grid of West Bengal State Electricity Board for the adjoining villages," said Rajah Banerjee, owner of Makaibari Tea Estate.

He said once installed, this generating unit could help cut production costs by 5-6%. According to Gon Chaudhuri, it will cost Rs 60 lakh to install 100 KW micro hydel generating units in each tea garden. "The Centre will give Rs 15 lakh as subsidy."

Earlier, the West Bengal Green Energy Development Corporation (WBGEDC) and the Tea Board had jointly mooted this proposal and submitted to the Centre. "We are playing the role of facilitator and coordinator in this project," said Roshni Sen, deputy chairman of Tea Board.

Source: Times of India